Neon Purification
CoolBaugh, PA
This greenfield project consisted of the installation of 8 modules, interconnects, exterior vaporizer, storage tanks, and installation of reactors for Neon Purification. Keeley Construction installed approximately 5000’ of ½” to 10” piping, both stainless steel and carbon steel. We also fabricated and installed pipe racks and a bridge from the main plant to the new plant. In addition, Keeley installed all the electrical, instrumentation, and fiber. A 60’x30’ PEMB building with a removable roof was also installed on the site.
Neon Purification
CoolBaugh, PA
This greenfield project consisted of the installation of 8 modules, interconnects, exterior vaporizer, storage tanks, and installation of reactors for Neon Purification. Keeley Construction installed approximately 5000’ of ½” to 10” piping, both stainless steel and carbon steel. We also fabricated and installed pipe racks and a bridge from the main plant to the new plant. In addition, Keeley installed all the electrical, instrumentation, and fiber. A 60’x30’ PEMB building with a removable roof was also installed on the site.
LOOKING FOR A CONSTRUCTION PARTNER?
You Deserve a Keeley'n
Thank you for contacting us.
We will get back to you as soon as possible.
We will get back to you as soon as possible.
Oops, there was an error sending your message.
Please try again later.
Please try again later.