Neon Purification

CoolBaugh, PA


MARKET

Industrial Gases


DELIVERY METHOD

Self Perform


PROJECT STATUS

Complete

This greenfield project consisted of the installation of 8 modules, interconnects, exterior vaporizer, storage tanks, and installation of reactors for Neon Purification. Keeley Construction installed approximately 5000' of 1/2" to 10" piping, both stainless steel and carbon steel. We also fabricated and installed pipe racks and a bridge from the main plant to the new plant. In addition, Keeley installed all the electrical, instrumentation, and fiber. A 60'x30' PEMB building with a removable roof was also installed on the site.