Leadwood Water Distribution Improvements
Leadwood, MO
MARKET
General Contractor
DELIVERY METHOD
In Progress
PROJECT STATUS
Water
Leadwood Water Distribution Improvements is a comprehensive new-build infrastructure project serving the entire city of Leadwood, Missouri. As General Contractor, Keeley Construction is self-performing all work except for watermain testing. The project includes the installation of 49,610 lineal feet of water distribution piping ranging from 2" to 6" in diameter, and 500 water meter services from 3/4" to 2" in diameter. The scope covers every city street, fully decommissioning the existing water distribution system and connecting all properties to the new watermain. Restoration efforts include approximately 72,900 square feet of asphalt and concrete patching across roadways, sidewalks, and driveways. This citywide upgrade ensures reliable water service for all residents and businesses in Leadwood.