top of page

Messer Neon Purification
This greenfield project consists of an installation of 8 modules, interconnects, exterior vaporizer, storage tanks, and installation of reactors for Neon Purification.
Project Details
This greenfield project consists of an installation of 8 modules, interconnects, exterior vaporizer, storage tanks, and installation of reactors for Neon Purification. Keeley Construction installed approximately 5000’ of ½” to 10” piping, both stainless steel and carbon steel. We also fabricated and installed pipe racks and bridge from the main plant to the new plant. In addition, Keeley installed all the electrical, instrumentation, and fiber. A 60’x30’ PEMB building with a removable roof was also installed on the site.
Power in Numbers
2023
CoolBaugh, PA
bottom of page